Commercial

Boateng Shopping Mall

Kumasi, Ghana 🇬🇭
June 2023
85 kW
System Size
189 x 450W panels
£16,200
Annual Savings
Per Year
45 tons/year
CO₂ Offset
Annually
25+
Year Lifespan
Warranty Included

Project Overview

Large mall installation powering retail operations and reducing operational costs significantly.

The Challenge

The business faced rising energy costs, frequent power interruptions affecting operations, and pressure to reduce their carbon footprint. A reliable renewable energy solution was essential for business continuity and sustainability goals.

The Solution

Voltis Energy designed and installed a comprehensive solar system tailored to the specific energy needs of this commercial. Our solution included premium solar panels, advanced inverter technology, and grid-tie capabilities to ensure maximum efficiency and reliability.

Key Features

LONGi panels
Growatt inverters
Peak shaving
Real-time analytics

System Benefits

24/7 Reliable Power Supply
Up to 90% Reduction in Energy Bills
Zero Emissions, Clean Energy
25-Year Performance Warranty

Results & Impact

Measuring success through savings, sustainability, and satisfaction

£162,000

10-Year Savings

Projected cumulative savings over the next decade

450 tons

CO₂ Reduction

Total carbon emissions prevented over 10 years

100%

Client Satisfaction

Happy with their decision to go solar with Voltis Energy

Ready for Your Solar Journey?

Let us design a custom solar solution for your property. Get started with a free consultation today.